Addition/Expansion
Trios Birth Center | Trios Health Southridge Campus
![](https://www.laytonconstruction.com/wp-content/uploads/sites/7/2023/03/Trios-Birthing-Center_Hero-1.png)
Location
Kennewick, WA
Total Size
32,500 SF
Architect
Earl Swensson Associates
A new place for new life.
In relocating the Family Birthing Center at Trios Women’s and Children’s Hospital, Layton completed a two-story vertical expansion above the first floor surgery department. The expansion provides patients a single location for many services while streamlining patient support. Layton added two dedicated rooms for C-section deliveries, six LDRP rooms, and a 10-bed critical care nursery and converted 11 existing beds from the medical/surgical floors to postpartum beds on an expanded third floor.
Client: LifePoint Health
![Exterior drone view of the Trios Birthing Center](https://www.laytonconstruction.com/wp-content/uploads/sites/7/2023/03/Trios-Birthing-Center_Gallery_4.png)
![Exterior view of the Trios Birthing Center](https://www.laytonconstruction.com/wp-content/uploads/sites/7/2023/03/Trios-Birthing-Center_Gallery_3.png)
![Interior view of the nurse station inside the Trios Birthing Center](https://www.laytonconstruction.com/wp-content/uploads/sites/7/2023/03/Trios-Birthing-Center_Gallery_5.png)
![Interior view of patient bed in the Trios Birthing Center](https://www.laytonconstruction.com/wp-content/uploads/sites/7/2023/03/Trios-Birthing-Center_Gallery_1.png)
![Interior view of operating room at the Trios Birthing Center](https://www.laytonconstruction.com/wp-content/uploads/sites/7/2023/03/Trios-Birthing-Center_Gallery_2.png)
![Interior view of seating areas in the Trios Birthing Center](https://www.laytonconstruction.com/wp-content/uploads/sites/7/2023/03/Trios-Birthing-Center_Gallery_6.png)