Ball Corporation Canning Facility

Location

Glendale, AZ

Total Size

712,000 SF

Delivery

Design-Build

Architect

Butler Design Group

Producing 6.5 million cans per day.

This manufacturing facility takes 6.5 million cans on a sophisticated, logistical journey every day. The cans move along a conveyor system through a 280-foot-long bridge that connects to an adjacent facility where cans are filled with the flavored energy drink and sealed. They're then conveyed through a second, 418-foot-long bridge to neighboring Project Lagerhaus (also built by Layton), where the product is stored and distributed. While this is not your grandmother’s idea of Ball, she would be quite impressed.
Client: Merit Partners, Inc