Manufacturing
Ball Corporation Canning Facility

Location
Glendale, AZ
Total Size
712,000 SF
Delivery
Design-Build
Architect
Butler Design Group
Producing 6.5 million cans per day.
This manufacturing facility takes 6.5 million cans on a sophisticated, logistical journey every day. The cans move along a conveyor system through a 280-foot-long bridge that connects to an adjacent facility where cans are filled with the flavored energy drink and sealed. They're then conveyed through a second, 418-foot-long bridge to neighboring Project Lagerhaus (also built by Layton), where the product is stored and distributed. While this is not your grandmother’s idea of Ball, she would be quite impressed.
Client: Merit Partners, Inc