Mission Critical
DataBank SLC 6

Location
Bluffdale, UT
Total Size
173,000 SF
Capacity
22 MW
Architect
Corgan
Cooling the cloud, sustainably.
This two-story data center was delivered on a fast-track schedule, achieving full power-up in just 10 months. The facility features four customized data halls with rooftop chillers, Chill-Pak pump houses, fan walls, and CRAH units for precision cooling. Power infrastructure includes substation transformers, switchgear, and PDUs, backed by 3MW generators and UPS systems for redundancy. The compressed 10-month timeline from construction to operational capacity demonstrates exceptional project execution and coordination.
Client: DataBank