Project Sol Robotic Fulfillment Center
Working with a repeat client, Layton completed this massive facility on a fast-track schedule—which at project end became the fastest-built robotic fulfillment facility in the company’s network. The build-to-suit facility serves as a four-level automated distribution warehouse with four mezzanines within and office space. These added structures bring the total available floor space to 2.3 million SF, complete with numerous bays for trailer parking and space for racking and material handling equipment. The structure consist of steel joists and metal roof deck, with seven-inch-thick concrete slab throughout.
SIZE
2,300,000 SF
LOCATION
Goodyear, AZ
KEY FEATURES
Fast-track build-to-suit warehouse for a major e-commerce client; fulfillment and distribution center where thousands of robots help distribute product; 39-foot clear height; 7-inch reinforced concrete slab; steel joists and metal roof deck; four mezzanine containing products which are moved along a conveyor system.